FPSO & Heavy Lift Crane
External Mooring turret
- FPSO Sangomar (China)
- BP Angola (Malaysia)
- FPSO OKHA (Singapore)
- FSRU Livorno (UAE)
- FPSO Aquila (UAE)
- TGT turret (Singapore)
- Rubicon (Singapore)
- OSX3 (Malaysia)
- Xikomba (Singapore)
- Tullow Ten (Singapore)
-
Gaza FSO (Singapore) View More
Gaza FSO (Singapore)
Gaza FSO External Turret Machining
- Turret shaft (inconel overlay)
- Outer shaft bearing mounting surface
- Upper cantilever bearing mounting surface
- Turntable
- Swivel support structure
Country: Singapore
Year: 2014
Duration: Approx. 53 days (24/7)
- Petronas FLNG 2 (Malaysia)
- Hess North Malay (Malaysia)
- Angola (Malaysia)
-
Angola 15/06 east hub (Singapore) View More
Angola 15/06 east hub (Singapore)
In situ machining of External Turret and Put in Beam
- Turret shaft bearing mounting surface
- Turret head bearing mounting surface
- Swivel pedestal
- Put in beam
Country: Singapore
Year: 2016
Duration: Approx. 29 days (24/7)
- Golden star (Malaysia)
Internal Mooring turret
- P57 (Singapore)
- Skarv (Korea)
- Aseng (Singapore)
- Espirito Santo
- D1 Turret (Singapore)
- Quad 204 (Singapore & Korea)
- OSX2 (Singapore)
- Jordbear (Korea)
- Prelude (Korea & UAE)
- Ichthys (Singapore & korea)
- Culzean (Singapore)
- Benchamas (Malaysia)
- Nippon Lanyang (China)
- Helang (China)
- Johan Castberg (UAE & Singapore)
-
Coral South FLNG (Korea) View More
Coral South FLNG (Korea)
Date Completion : 12/11/2021Machining of Coral FLNG South
- Lower bearing support structure
Country: Korea
Year: 2019
Duration: Approx. 75 days (24/7)
- Capixaba (Singapore)
-
Liuhua FPSO (China) View More
Liuhua FPSO (China)
Liuhua FPSO Turret Machining
- Manifold Stopper Raceway
- Bearing Support Casting
- Bearing Support Flange
- Swivel Stack Base Plate Bearing Surface
Country: China
Year: 2019
Duration: 40 days (24/7)
-
LMC internal turret (China) View More
LMC internal turret (China)
LMC Internal Turret Machining
- Turret shaft Lower bearing (Inconel overlay)
- Swivel support structure
- Riser handoff Flanges
Country: Penglai,China
Year: 2018
Duration: Approx. 37 days (24/7)
Disconnectable Turret System
- Glas Dowr (Singapore)
- Nexsus STP (Indonesia)
- Athena (Indonesia)
- Hai Thach (Indonesia)
- Lufeng (China)
- Hadera (Indonesia)
- Enping (China)
- Stone (Singapore)
- Kraken (Indonesia)
- Mariner (Indonesia)
- Catcher (Indonesia)
-
Kaombo north (Singapore) View More
Kaombo north (Singapore)
Kaombo Norte Casing Structure Machining
- Lower bearing ring support
- Upper casing surface
- Swivel stack foundation
- Rotating Sheave Foundation
Country: Singapore
Year: 2015
Duration: Approx. 43 days (24/7)
- Kaombo South (Singapore)
- Panyu (Indonesia)
-
Santos Mutineer ( Singapore & Malaysia) View More
Santos Mutineer ( Singapore & Malaysia)
Santos Mutineer detachable turret Machining
- Bearing support structure
- Lower turret module (turret shaft)
- Moonpool (lower bearing)
- Spider buoy connector module
Country: Singapore & Malaysia
Year: 2003
Duration: Approx. 50 days
Crane
- NOV AmClyde PC37 (China)
- Norce Offshore Amclyde (Singapore)
- Gusto 800 ton (China)
- DB50 crane barge (Singapore)
- Swiber Kaisen 4000 (Singapore)
- LB32 (Singapore)
-
M78 crane tub (China) View More
M78 crane tub (China)
M78 Crane Deck Assembly Machining
- Camber profile on top flange
- Camber profile no bottom flange
- Centre structure
Country: Penglai, China
Year: 2015
Duration: Approx. 31 days (24/7)
- Heerema tub (Singapore)
- 800MT PMC Huisman crane (Japan)
- SEMAC 1 (Singapore)
- M80 (China)
-
Gottwald crane (Malaysia) View More
Gottwald crane (Malaysia)
Gottwald Crane: Refurbishment for changing of main slew bearing
Country: Penang, Malaysia
Year: 2003
Duration: 3 days
Calm Buoy
- Catenary Anchor Leg Mooring (Calm) Buoys (China)