我们的团队取得了非常好的进展,全力以赴加快了客户的进度。所有加工范围都在所要求的规范内完成,团队计划在2023年4月20日之前返回新加坡.

The surface finishing achieved for both drilling and milling

Completion of the drilling scope for crane pedestal

Drilling on slewing platform 1

Drilling on slewing platform 2

Using Total station to check the boring bar setup 1

Using Total station to check the boring bar setup 2